Ecuador’s Sistema Nacional Interconectado (SNI) leans heavily on hydroelectricity—at times covering around 90% of national demand (per CENACE figures cited by Lupa). (LupaMedia)

Where the big hydropower plants are (high-level “map”)

Think of Ecuador’s hydropower as clusters along major river basins:

  • Amazon/Andes (north-east): Coca Codo Sinclair (the country’s largest) is located between Napo and Sucumbíos and has 1,500 MW installed capacity. (Reuters)
  • Southern Andes (Azuay–Cañar): the Paute cascade (“Paute Integral”)
    • Mazar (upstream storage/regulation) and downstream plants Molino and Sopladora operate as a linked system; Mazar’s reservoir is treated as a key “regulating battery” for the country. (celec.gob.ec)
  • Central Andes (Baños / Río Pastaza):San Francisco is on the Río Pastaza near Baños de Agua Santa (Tungurahua), with 230 MW installed. (celec.gob.ec)
    • Agoyán also uses the Río Pastaza, located near Baños (sector Agoyán, parish Ulba, Tungurahua). (celec.gob.ec)
  • Western Andes (Pichincha–Santo Domingo–Cotopaxi): Toachi-Pilatón uses the Toachi and Pilatón rivers on the western slope; it spans those provinces and totals 254.4 MW (Sarapullo + Alluriquín + mini plant). (celec.gob.ec)
  • South / Jubones basin: Minas San Francisco is on the Río Jubones (project details include reservoir/tunnel works and grid interconnection). (celec.gob.ec)
  • South-east (Zamora Chinchipe): Delsitanisagua is in Zamora Chinchipe with 180 MW. (celec.gob.ec)
  • North-west (Pichincha–Imbabura): Manduriacu sits between Pacto (Quito, Pichincha) and García Moreno (Cotacachi, Imbabura), with 65 MW. (celec.gob.ec)

“Reservoir dam” vs “run-of-river” (the key difference)

Hydropower comes in two common flavors:

  • Run-of-river / diversion: channels river flow through a canal/penstock to turbines, with little or no storage—so output tracks the river’s flow more closely. (hydropower.org)
  • Storage (reservoir) hydropower: uses a large reservoir so operators can store water and generate when needed (more controllable/dispatchable). (hydropower.org)

Ecuador has both—but what matters operationally is that the system’s “flexibility” often depends on a few big reservoirs that can buffer dry spells and support downstream plants (a classic example is the Paute Integral chain). (celec.gob.ec)

Why “no rain for a few days” can hit generation (even quickly)

This surprises people, but it’s normal physics + hydrology:

  1. Run-of-river plants feel it immediately. With minimal storage, if river flow drops, turbine flow drops—so megawatts drop. (hydropower.org)
  2. Small basins respond fast. After rain stops, streams can fall quickly (less runoff + less groundwater “baseflow”), especially in steep catchments.
  3. Even reservoirs can be “forced to save water.” If a key reservoir is already low, operators often reduce output to protect the reservoir level for system stability and future demand. Reuters described how low levels led Ecuador to shut down parts of the Paute Integral (including Mazar and downstream plants) to conserve water during the 2024 drought. (Reuters)
  4. Cascade systems multiply the effect. In a chain like Mazar → Molino → Sopladora, upstream decisions and inflows propagate downstream. CELEC notes Amaluza (Molino’s reservoir) and explains how upstream infrastructure like Mazar helps manage sediments and system operation in that basin. (celec.gob.ec)

A concrete example: Paute Integral’s “water battery”

  • Molino’s Embalse Amaluza has about 120 million m³ storage (with 100 million m³ “useful” volume in design terms). (celec.gob.ec)
  • Mazar is described by CELEC as indispensable for regulation of the Paute Integral complex, and CELEC reports its reservoir volume in the hundreds of millions of cubic meters. (celec.gob.ec)
    So when Mazar is low, it’s not just “one plant”: it can constrain multiple downstream plants and the whole dispatch strategy.

Explicador: el sistema hidroeléctrico de Ecuador (cómo funciona, dónde está y por qué la lluvia impacta rápido)

El Sistema Nacional Interconectado (SNI) de Ecuador depende mucho de la generación hidroeléctrica—en ciertos momentos ha cubierto cerca del 90% de la demanda nacional (cifras de CENACE citadas por Lupa). (LupaMedia)

Dónde están las principales hidroeléctricas (mapa mental)

Piensa en “bloques” por cuencas:

  • Amazonía/Andes (nororiente): Coca Codo Sinclair (la más grande) está entre Napo y Sucumbíos y tiene 1.500 MW. (Reuters)
  • Sierra sur (Azuay–Cañar): el encadenamiento del Paute (“Paute Integral”)
    • Mazar (almacenamiento/regulación) y las centrales aguas abajo Molino y Sopladora funcionan como un “sistema en cascada”; Mazar se maneja como un embalse clave para regular el sistema. (celec.gob.ec)
  • Sierra central (Baños / Río Pastaza):San Francisco está en el Río Pastaza (cantón Baños, Tungurahua) con 230 MW. (celec.gob.ec)
    • Agoyán también aprovecha el Río Pastaza, cerca de Baños (sector Agoyán, parroquia Ulba, Tungurahua). (celec.gob.ec)
  • Andes occidentales (Pichincha–Santo Domingo–Cotopaxi): Toachi-Pilatón aprovecha los ríos Toachi y Pilatón; se desarrolla entre esas provincias y suma 254,4 MW. (celec.gob.ec)
  • Sur / cuenca del Jubones: Minas San Francisco está sobre el Río Jubones (con obras de presa/embalse, túneles y evacuación al sistema). (celec.gob.ec)
  • Suroriente (Zamora Chinchipe): Delsitanisagua está en Zamora Chinchipe con 180 MW. (celec.gob.ec)
  • Noroccidente (Pichincha–Imbabura): Manduriacu se ubica entre Pacto (Quito, Pichincha) y García Moreno (Cotacachi, Imbabura) con 65 MW. (celec.gob.ec)

“Embalse grande” vs “a filo de agua / run-of-river”

  • A filo de agua (run-of-river / derivación): tiene poco o nada de almacenamiento, por eso la generación depende más del caudal disponible en el río. (hydropower.org)
  • Con embalse (almacenamiento): el agua se guarda para generar cuando el sistema lo necesita (más control y flexibilidad). (hydropower.org)

Por qué “unos días sin lluvia” pueden afectar rápido

  1. En centrales a filo de agua, si baja el caudal, baja la potencia casi de inmediato. (hydropower.org)
  2. Algunas cuencas reaccionan muy rápido: sin lluvia, el escurrimiento disminuye y los ríos bajan.
  3. Si un embalse clave ya está bajo, el operador puede “cuidar” el nivel reduciendo generación. Reuters explicó que en 2024 Ecuador llegó a apagar centrales del Paute Integral para conservar el embalse en plena sequía. (Reuters)
  4. En sistemas en cascada (ej. Mazar → Molino → Sopladora), lo que pase arriba se siente abajo. CELEC describe el rol del Embalse Amaluza (Molino) y cómo Mazar ayuda a la operación/gestión en esa cuenca. (celec.gob.ec)

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Scroll to Top
Verified by MonsterInsights